Introduction
Step 1: Pre-Installation Planning
Step 2: Prepare the Site
Step 3: Install the Fire Pump Components
Step 4: Install Auxiliary Equipment
Step 5: Electrical Connections and Controls
Step 6: Perform Alignment and Coupling
Step 7: Testing and Commissioning
Step 8: Final Inspection and Certification
Step 9: Ongoing Maintenance Recommendations